Hot water drilling gets underway!

The team have begun to melt a hole through the ice to make our well. They’re using water from snow melted in the flubbers, warmed through six heaters to reach around 75°C, passed through the hose and out the hot water drill nozzle, which is slowly lowered through the ice to melt the hole.

They’ll melt the hole to around 100m below the ice surface, widen it to make a well cavity, and install a pump.

Once the well pump is in place circulating water up to the flubbers, we’ll have an endless supply of water for drilling out main borehole through the 500m of ice.

View all articles
Ross Shelf Reports
Drilling wraps up at Crary Ice Rise

Drilling wraps up at Crary Ice Rise

09 January 2026

We’ve completed drilling at Crary Ice Rise with a whopping 228 metres of sediment core, exceeding our target of 200 metres!

view
Ross Shelf Reports
200 metres of sediment core!

200 metres of sediment core!

06 January 2026

Third time’s a charm - we have successfully drilled 200 metres of sediment core from beneath the ice sheet at Crary Ice Rise!

view