Drilling through the storm

Today a storm swept through the camp, with high winds of 35 kts gusting to 45 kts blowing snow and poor visibility for many hours. However, these tough conditions didn’t stop our drillers from continuing with their work, it was business as usual with a few extra layers.

And with core coming up, our science team needed to be there to curate and process it, although fortunately the cold science tent is a little less exposed from the elements than the outside drill rig.

View all articles
Ross Shelf Reports
Drilling wraps up at Crary Ice Rise

Drilling wraps up at Crary Ice Rise

09 January 2026

We’ve completed drilling at Crary Ice Rise with a whopping 228 metres of sediment core, exceeding our target of 200 metres!

view
Ross Shelf Reports
200 metres of sediment core!

200 metres of sediment core!

06 January 2026

Third time’s a charm - we have successfully drilled 200 metres of sediment core from beneath the ice sheet at Crary Ice Rise!

view